Site Preparation: The site is prepared by grading the soil and ensuring that it is level and stable. The perimeter of the slab is marked, and any necessary plumbing or electrical lines are installed.
Footings: The perimeter of the slab is excavated to a depth below the frost line and a width of about 12-18 inches. Rebar is installed in the footing trenches, and concrete is poured into the trenches to create a continuous footing around the perimeter of the slab.
What Is Dressing of Stone | Types of Dressing of Stone
Alignment of Road | Alignment In Design | Horizontal Alignment of Road | Vertical Alignment of Road
What Is Auxiliary Plane | Types of Auxiliary Plane | Types of Auxiliary View | How to Draw Auxiliary View | Drawing Steps for Auxiliary View
Well Point System | Types of Well Point System | Well Point Dewatering | PVC Well Point | Well Point Installation | Well Point for Shallow Well
What Is a Cavity Wall | How to Build a Cavity Wall | Cavity Wall Detail | Cavity Wall Thickness | Cavity Wall Insulation Pros and Cons | Brick Cavity Wall