Mivan Shuttering | Merit & Demerit Mivan Technology | Mivan Formwork Assembly Process

Mivan Shuttering: Mayan Technology

This Construction Technique Involves - 3 Unique Steps:

Read more

1. Installation of Wall Reinforcing Steel 

2. Placing Aluminum Formwork -

Read more

3. Concrete Pouring -

Merits of Mivan Technology

Read more
  • Speed - reduces the total rotation time by almost half when compared to conventional construction techniques.
  • Requires less work - With a defined procedure and checklists to follow, this technology minimizes the need for skilled labor and also eliminates activities such as masonry and rendering activities that require a lot of work.
  • Seismic and Durable Resistance - Buildings are more resistant to seismic and more
  • Less maintenance - Mainly without construction joints and with free-flowing concrete used, this technology reduces the chances of infiltration, which results in negligible
  • Smooth Finish - The construction of the Mivan ensures uniformity, therefore, all walls and slabs have a smooth finish, which means that no additional plastering is required.
  • Larger carpet area - offers the possibility of removing more carpet area compared to traditional construction techniques.
  • Earthquake resistant - more earthquake resistant and safer in the event of a strong This is because the structures built using the Mivan are monolithic concrete structures that act as a single strong unit.
Read more

Mivan Technology Demerits

Mivan Formwork

Read more

Mivan Formwork Components

1. Wall Components

Read more

2. Beam Components

3. Platform Components

Read more

4. Other Components

Mivan Formwork Assembly Process

Read more

1. Placing Aluminum Formwork

2. Pouring concrete

Read more

3. Formwork Strike

Mivan Formwork Features

Read more
  • Load Capacity: The load capacity of the Mivan formwork is 7-8 tonnes per square meter. The Mivan formwork is light and weighs about 18 to 20 kg per square meter.
  • Hit Time: The impressive vertical formwork time (wall) is 12 hours after pouring or when the concrete strength reaches 2N / mm2 and the horizontal formwork (deck) is 36 hours after pouring or when the concrete strength reaches 10N / mm2.
  • Durability: As the Mivan formwork panels are made of structural quality aluminum alloy, they are very durable and resistant. A single component can be repeated about 200 times.
  • Cycle time: High construction speed can be achieved by this system, which means faster completion of the project. Approximately, the time required to lay the floor in 7 days using Mivan.
Read more

What Is Mivan Construction?

Mivan Construction

Read more

What Is Mivan Technology in Construction?

Mivan Shuttering Components

Read more

Mivan Shuttering Details

Myone Shuttering

Read more

Mivan Components

  • Wall Components. A. Wall Panel.
  • Beam Components. A. Beam Side Panel.
  • Deck Components. A. Deck Panels.
  • Other Components. Ad. The other components used excluding wall, beam and deck components are internal and external soffit corners, exterior and interior corners for wall panels.
Read more

Mivan Aluminium Formwork

First Slab Time Duration Using Mivan

Read more

Mivan Wall

Mivan Wall Panel Size

Read more

Rocker in Mivan Shuttering

Mivan Shuttering Is Code

Read more
  • What Is Honeycomb In Concrete | Cause | Cure | Type of Grouting.
  • Difference Between One Way Slab and Two Way Slab | What is Slab
  •  What Is Cover in Concrete | Clear Cover in Beams, Slab, Column, Footing
  • What Is Granolithic Floors | Construction Method | Advantages аnd Disadvantage
  • Detail of Beam Connection | Simple Framing Connection | Semi-Rigid Framing Connection | Rigid Frame Connection