Installation of drilled piers needs careful supervision and quality control of all the materials used in the construction
The method is cumbersome. It needs sufficient storage space for all the materials used in the construction
The advantage of increased bearing capacity due to compaction in granular soil that could be obtained in driven piles is not there in drilled pier construction
Construction of drilled piers at places where there is a heavy current of ground water flow due to artesian pressure is very difficult