Important Point in Rate Analysis of RCC (Reinforcement Cement Concrete)

Measurement of RCC (Reinforcement Cement Concrete):

Read more
  1. Dimensions shall be measured to the nearest 0·01 m except for the thickness of slab which shall be measured to nearest 0·005 m,
  2. Areas may be worked out to the nearest 0·01 square meter.
  3. Cubic contents shall be worked out to the nearest 0·01 cubic meter.
Read more

Dednctioan of RCC (Reinforcement Cement Concrete):

Work to be Measured Separately

Read more
  • Work in or underwater,
  • Work in liquid mud,
  • Work in or under foul situations,
  • Work under tides and
  • Work in snow.
Read more

Rate Analysis of RCC (Reinforcement Cement Concrete)

Sr No.DescriptionQtyUnitRateCost
R.C.C. works of M-20 grade with 20mm and downgrades black hard granite (crusher broken) stone chips including hoisting and laying Data for 10 cu.m.
Details of cost for 10.00 Cu.m.
ALabour Charges
1Mason -1 st0.50Day700.00350.00
2Mason -2nd0.50Day600.00300.00
3Bhisti2.70Day400.001080.00
4Coolie6.00Day400.002400.00
5Mate0.40Day500.00200.00
BMaterial
1Cement85.20Bag320.0027264.00
2Wastage Extra2%545.28
3Sand4.43Cu.m.1325.005869.75
4Wastage Extra7%410.88
5Aggregate 20 mm5.40Cu.m.1125.006075.00
6Wastage Extra5%303.75
7Aggregate 10 mm3.60Cu.m.1110.003996.00
8Wastage Extra5%199.80
9Reinforcement 2% as per Volume(2%*10 Cu.m)200K.g.56.0011200.00
10Wastage Extra @ reinforcement2%224.00
CHire and Running Charges of Mech Mixer5%2804.42
DTransportation Cost 1%1%560.88
EOther Charges 2 % Extra2%1208.37
FAdd for Water Charge @ 1% on Items Marked1%604.18
GAdd for Contractor's Profit @15% on Items Marked15%9062.77
Cost of 10.00 Cu.m.74009.09
Cost of Cu.m.7400.91
Round off Cu.m.7401.00
Read more

Material Calculation in Rate Analysis like Cement, Sand, Aggregate, and Reinforcement

Read more

Cement Calculation

  • = 1.625 x 0.1819
  • = 0.2956 cu.m. cement requirement
  • Cement in k.g. = volume x density cement
  • Cement in k.g. = 0.2956 cu.m. x 1440 (1440 kg/m Density of cement for 50 k.g)
    • = 0.2956 x 1440 = 425.646 kg of cement of bag requied ment of cement in k.g.
    • = 425.646 / 50 (one cemnent bag weight 50 k.g. only) = 8.51 bag
  • So, 10 cu.m. concrete requirement of cement = 8.52 bag x 10 cu.m. = 85.20 bag
Read more

Sand Calculation

  • Required amount of Sand = 1.625 Cu.m. x (1.5/(1+1.5+3))
    • =0.443 Cu.m. requierd of sand for 1 Cu.m.
  • So,
    • 10 cu.m. concrete requirement of sand = 0.443 Cu.m x 10 cu.m. = 4.43 cu.m.
Read more

Aggregate Calculation

  • The required amount of Aggregate
    • = 1.625 Cu.m. x (3/(1+1.5+3))
    • =0.90 Cu.m. required of sand for 1 Cu.m.
  • So,
    • So, 10 cu.m. concrete requirement of sand = 0.90 Cu.m x 10 cu.m. = 9.0 cu.m.
    • Two types of aggregate like 20 mm & 10 mm size. this ratio 60 % of total aggregate 20mm size, 40 % of total aggregate 20mm size
    •  20 mm aggregate = 9.0 cu.m. x 60% = 5.4 cu.m. 20 mm size aggregate
    • 10 mm aggregate = 9.0 cu.m. x 40% = 3.6 cu.m. 20 mm size aggregate
Read more

Reinforcement Calculation

  • Assume of reinforcement 2% of the total volume of concrete.
  • so,
    • 1 cu.m. concrete for reinforcement = 1.0 x 2% = 0.02 ton of steel (this 2% only assumse as per exprience)
    •   Her, 10 Cu.m concrete requirement = 0.02 ton x 10 co.m. =0.20 ton = 200 kg for 10 cu.m.
Read more

Labour for Rate Analysis of Concrete

Extra Work Calculation in Rate Analysis of Concrete

Read more

Rate Analysis of Concrete

  • Quantity of Material and Its Cost.
  • Labour Cost.
  • Cost of Equipment or Tools and Plants( 1.5%)
  • Other Charges (2 to 5%)
  • Water Charges (1%)
  • Contractor Profit (10 to 15%)
Read more

Rate Analysis for Concrete

Rate Analysis for Concrete Excel

Read more
  • No. of Cement Bags: Volume of cement necessary for 1 m3 of concrete = [1 x 1.54] / [1 + 1.5 + 3] =0.28 m3
  • Volume of Sand: Volume of sand necessary for 1 m3 of concrete = [1.5 x 1.54] / [1 + 1.5 + 3] =0.42 m3
  • Volume of Coarse Aggregate: Volume of coarse aggregate necessary for 1 m3 of concrete = [3 x 1.54] / [1 + 1.5 + 3] =0.84 m3
  • Amount of Steel Reinforcement: The types of a structural element will find out the quantity of steel necessary.
Read more

Rate Analysis of Rcc Slab Construction

Rate Analysis of Rcc Beam Construction

Read more

Rate Analysis of Rcc Column Construction

  • Column concreting: The labor rate of column concreting will be between INR 600/- to 1000/- per CUM. ...
  • Reinforcement: The labor rate of column reinforcement work will be between INR 9/- to 15/- per kg. ...
  • Formwork:
Read more

Rate Analysis of Rcc Foundation Construction

  • Excavation: The cost of excavation includes the labor, machinery, and tools required for digging the foundation trench to the required depth and dimensions. It may also include the removal and disposal of excavated soil.
  • Concrete: The cost of concrete includes the materials (cement, aggregates, water) required for the foundation. The quantity and rates of these materials depend on the design and specifications of the foundation.
  • Reinforcement: The cost of reinforcement includes the steel bars or mesh used to reinforce the foundation. The quantity and rates of reinforcement depend on the design and specifications of the foundation.
Read more

Rate Analysis of Rcc Wall Construction

  • Excavation: The cost of excavation includes the labor, machinery, and tools required for preparing the foundation or trench for the wall.
  • Concrete: The cost of concrete includes the materials (cement, aggregates, water) required for the wall construction. The quantity and rates of these materials depend on the design and specifications of the wall.
  • Reinforcement: The cost of reinforcement includes the steel bars or mesh used to reinforce the wall. The quantity and rates of reinforcement depend on the design and specifications of the wall.
Read more

Concrete Rate Analysis

  • Cement: Cement is a major component of concrete. The cost of cement is calculated based on the quantity required for the project and the prevailing market rates.
  • Aggregates: Aggregates, including sand and coarse aggregates (such as crushed stone or gravel), are mixed with cement to form concrete. The cost of aggregates is calculated based on the required quantity and the current market rates.
  • Water: Water is needed for the hydration of cement and the proper mixing of concrete. The cost of water is typically negligible and can be estimated based on the consumption for the project.
Read more

Rcc Rate Per Cubic Meter

How to Calculate Rcc Work?

Read more
  1. Quantity of Cement in 1 CUM Concrete is = 1.54x 1/7 x 1440 = 316.80 Kgs.
  2. Quantity of Sand in 1 CUM Concrete is = 1.54 x 2/7 x 1450 = 638.00 Kgs.
Read more

What Is Ratio of Cc Used in Rcc Lintel?

How Do You Calculate Rate Analysis?

Read more

Rate Analysis in Civil Engineering

What Is Rate Analysis?

Read more

What Is Rate Analysis in Civil Engineering?

  • Brick Reinforcement
  • Type of Stair | Stairs Parts Names & Details
  • Hip Roof Vs Gable Roof | What Is Gable Roof | What Is Hip Roof
  • What Is Passometer & Pedometer | Advantage of Passometer & Pedometer
  • Mortar Vs Grout | What Is Motor and Grout | Type of Motor and Grout | Difference Between Mortar and Grou
  • What Is Hard Hat | Hard Hat Colour Definition | Different Hard Hat Colour Codes | Types of Safety Helmets | Classification of Hard Hats
Read more

Did you like this story?

Please share by clicking this button!

Visit our site and see all other available articles!

Civil-Jungles