This test is done in the field for every 20 co or part thereof.This is also a field test and is to be conducted for every 20 co.This test can be conducted on-site or in the laboratory for every 40 co sand.This test is conducted on-site for every 20 sand. Based on the bulking of the sand, the water-cement ratio suitable for concrete on site is calculated.