The first step should be the test fitting of a shower pan. The opening of the shower pan should be dried.
The second step is subfloor should be prepared properly. The whole lowest part of the shower pan should be placed on a flat, level area. Properly analyze the area of the subfloor from every angle. Left to right and from front to back to its level properly.
After completing the subfloor, move on to the next step. Self-leveling elements should be used if the subfloor is not plain and level.
Placed the shower drain border parts of a shower drain. The drain basket is the testing of the shower drain flange. The drain flange will deteriorate the materials of the shower pan. So it is critical to follow all the instructions of the producers carefully.
M30 Grade of Concrete Mix Design Procedure with OPC 53 Cement
What is Chain Surveying | Principles of Chain Surveying | Types of Chains Used in Surveying | Principle of Chain Surveying | Procedure of Chain Surveying | Obstacles in Chain Surveying