WBM Road | Material Required for Construction of WBM Road | Construction Procedure of WBM Road | Advantages & Disadvantages of WBM Road

Introduction of WBM Road

Material Required for Construction of WBM Road

Read more
  • Coarse Aggregates
  • Screenings
  • Binding Material
Read more

1. Coarse Aggregates

Size range in (mm)Sieve Size in (mm)
Read more
  1. The coarse aggregate should be durable.
  2. It should be hard enough to resist the load.
  3. The coarse aggregate should have acceptable shape.
  4. It should be free from flaky and Elongated particles.
  5. The Indian Road Congress has specified the physical requirements for the coarse Aggregates for the Construction of WBM roads.
  6. As per IRC the Los Angeles abrasion value of the coarse aggregate for the construction road construction layers of Sub-base, Base course and surface course are 60%,50% and 40%
  7. The Aggregate impact value of the sub-base, base course and surface course are 50%,40% and 30%
Read more

2. Screenings

Grading ClassificationSize of Screenings in (mm)Sieve Size in (mm)
Read more

3. Binding Material

Construction Procedure of WBM Road

Read more
  • Preparation of the Foundation for Receiving the Water-Bound Macadam Course.
  • Provision of the Lateral Confinement.
  • Spreading of the Coarse Aggregates.
  • Rolling.
  • Application of the Screenings.
  • Sprinkling and Grouting.
  • Application of the Binding Material.
  • Setting and Drying.
  • Preparation of Shoulder.
  • Opening to Traffic.
Read more

1. Preparation of the Foundation for Receiving the Water-Bound Macadam Course

2. Provision of the Lateral Confinement

Read more

3. Spreading of the Coarse Aggregates

4. Rolling on WBM

Read more

5. Application of the Screening

6. Sprinkling and Grouting

Read more

7. Application of the Binding Material

8. Setting and Drying

Read more

9. Preparation of Shoulder

10. Opening to Traffic

Read more

Advantages of WBM Road

  1. The construction cost of WBM road is low.
  2. There is no skilled labour required for the construction of WBM roads.
  3. The construction of the water-bound macadam Road is done by the locally available material.
  4. The capacity of water-bound macadam Road to take the traffic load of about 900 tonnes per lane per day.
Read more

Disadvantages of WBM Roads

  1. The maintenance cost of water bound macadam road is high.
  2. WBM Road is less durable as compared to other roads.
  3. WBM road can cause inconvenience and danger to the traffic if it is not maintained properly.
  4. WBM roads are permeable to the rainwater which can lead to the softening and yielding of the subsoil.
Read more

Maintenance of the Water Bound Macadam Roads.

  1. The Water Bound Macadam roads are not more durable as compared to the other roads.
  2. WBM roads required regular maintenance.
  3. There may be chances of occurring potholes on the road surface of WBM roads, it should be filled with the binding material.
  4. The corrugations should be removed and filled by the binding material.
  5. The loose aggregate in the WBM roads will come on the surface, it should be compacted and level properly.
Read more

Who Invented WBM?

WBM Meaning

Read more

What Does WBM Mean?

What Is WBM road?

Read more
WBM is Water Bound MacadamRead more

WBM Road Specification

How Is WBM Road Construction?

Read more
  1. Preparation of Foundation for WBM Road
  2. Provision for Lateral Confinement
  3.  Spreading of Course Aggregates
  4. Rolling Operation
  5. Application of Screenings
  6. Sprinkling of Water and Grouting
  7. Application of Binding Material
Read more

WBM Road Construction Procedure

  1. Preparation of the Foundation for Receiving the Water-Bound Macadam Course.
  2. Provision of the Lateral Confinement.
  3. Spreading of the Coarse Aggregates.
  4. Rolling.
  5. Application of the Screenings.
  6. Sprinkling and Grouting.
  7. Application of the Binding Material.
  8. Setting and Drying.
  9. Preparation of Shoulder.
  10. Opening to Traffic.
Read more

What Is WBM and WMM?

Advantages of Macadam Roads

Read more
  • Water bound macadam is superior in quality because the materials are carefully graded and the resulting mass is almost void less compacted mass.
  • The interlocking of aggregate particles imparts adequate strength of the materials selected for filling the voids.
Read more

Disadvantages of Macadam Bound Macadam.

What Is Purpose of WBM?

Read more

IS Code a Wbm Road?

What Are the Defects in WBM Road?

Read more
  1. Alligator Cracking.
  2. Consolidation of pavement layers.
  3. Shear failure.
  4. Longitudinal cracking.
  5. Frost Heaving.
  6. Lack of binding to lowers course.
  7. Reflection crushing.
  8. Formation of waves and corrugation.
Read more

What Is Binding Material in WBM?

  • Smooth Wheeled Roller
  • Peb Full Form in Construction
  • Difference Between CPM and PERT | What Is CPM & PERT
  • Hempcrete Vs Concrete | What Is Hempcrete | What Is Concrete
  • Difference Between Veneer and Laminate | What Is Veneer | What Is Laminate
  • Difference Between Compaction and Consolidation | What Is Compaction | What Is Consolidation
  • PVB Vs SGP | What Is Limited Glass | What Is Polyvinyl Butyral (PVB) | What Is Sentry Glass Plus (SGP)
  • BHK Full From | What Is BHK | What does 1BHK, 2BHK, 3BHK, 4 BHK, 2.5 BHK, 1 RK, 2 BHK 2T, 3 BHK 2T, 3 BHK 3T Mean