🏗️ Foundation Cost Calculator
Compare RMC vs Manual Footing Costing
RMC Calculator
Manual Footing Calculator
Cost Comparison
Project Details
Foundation Dimensions
m
m
m
nos
Additional Layers
m
RMC Cost Parameters
Material Rates
₹/m³
₹/m³
₹/ton
₹/m³
Labour Rates
₹/day
₹/day
₹/m³
Other Costs
₹/m³/km
%
%
How to Use RMC Calculator:
- Enter project details and foundation dimensions
- Select foundation type, concrete grade, and reinforcement type
- Specify PCC thickness and whether to include rubber soling
- Set steel quantity calculation method (automatic or manual)
- Set cost parameters for materials, labour, transport, overhead and profit
- Click “Calculate RMC Costs” to generate the cost breakdown
- Add custom items if needed with “Add Custom Item”
- Export to PDF or Excel when done
RMC Cost Breakdown Table
| Sr.No. | Detail | Qty | Unit | Rate | Amount (₹) | Action |
|---|
📈 RMC Project Summary
Total RMC Volume:
0 m³
Total PCC Volume:
0 m³
Total Cost:
₹0
Cost per m³ RMC:
₹0
Steel Required:
0 ton
Number of Items:
0
RMC Project Information
Project Name:
–
Location:
–
Date:
–
Foundation Type:
–
Concrete Grade:
–
Reinforcement:
–
Dimensions (L×W×D):
–
PCC Thickness:
–
Rubber Soling:
–
Export RMC Data
Save your RMC data in PDF or Excel format
Project Details
Foundation Dimensions
m
m
m
nos
Material Ratios for Concrete Mix
1
Cement
1.5
Sand
3
Aggregate
0.5
Water
Manual Footing Cost Parameters
Material Rates
₹/bag
₹/m³
₹/m³
₹/ton
Labour Rates
₹/day
₹/day
₹/day
Other Costs
₹/day
₹/m³/km
%
%
How to Use Manual Footing Calculator:
- Enter project details and foundation dimensions
- Select foundation type, concrete grade, and reinforcement type
- Set material ratios for concrete mix (cement:sand:aggregate:water)
- Set steel quantity calculation method (automatic or manual)
- Set cost parameters for materials, labour, machinery, transport, overhead and profit
- Click “Calculate Manual Footing Costs” to generate the cost breakdown
- Add custom items if needed with “Add Custom Item”
- Export to PDF or Excel when done
Manual Footing Cost Breakdown Table
| Sr.No. | Detail | Qty | Unit | Rate | Amount (₹) | Action |
|---|
📈 Manual Footing Project Summary
Total Concrete Volume:
0 m³
Total Cost:
₹0
Cost per m³:
₹0
Cement Required:
0 bags
Sand Required:
0 m³
Aggregate Required:
0 m³
Manual Footing Project Information
Project Name:
–
Location:
–
Date:
–
Foundation Type:
–
Concrete Grade:
–
Reinforcement:
–
Dimensions (L×W×D):
–
Concrete Ratio:
–
Steel Required:
–
Export Manual Footing Data
Save your Manual Footing data in PDF or Excel format
Cost Comparison: RMC vs Manual Footing
Compare the costs of RMC and Manual Footing methods for your project
About the Comparison:
- The comparison uses the same foundation dimensions for both methods
- RMC method includes excavation, PCC, rubber soling (if selected), and RMC concrete
- Manual method includes material costs for cement, sand, aggregate, and mixing labor
- Both methods include steel reinforcement, labor, transport, overhead, and profit
- Time estimates are based on realistic productivity rates