Thumb rule requirement of standard materials and standard calculation in high-raised building
- Steel =3 to 5 kg/sqft
- Cement =0.5bags/ sqft
- RMC =0.05 m3/sqft
- Block =12.5 nos /sqm
- Electrical cast = Rs 133/sqft
- Plumbing cost = Rs 126/sqft
- Fire fighting cost = Rs 40/sqft
- External development = Rs 94.5/sqft
- Civil works-Structure = RS 751.25/sqft
- Finishing works = RS 467.50/sqft
Also, Read: Top 10 Best Modular Switches Brands in India
Thumb Rule of Cement Constant
- 200 mm in cm 1:6 =0.124Bags /sqm
- 200 mm in cm 1:4 =0.206 bags/sqm
- 150 mm in cm 1:6 =0.093 bags/sqm
- 150mm in cm 1:4 =0.144 bags/sqm
- 100 mm in cm 1:4 =0.103 bags/sqm
- Ceiling plastering =0.11 bags/sqm
- Wall plastering =0.09 bags/sqm
- Rough plastering =0.09 bags/sqm
- Duct plastering =0.09 bags/sqm
- External plastering =0.175 bags/sqm
- Lathen plastering =0.55 bags/sqm
- Stucco plaster =0.175 bags/sqm
- 100 mm plaster band =0.012 bags/rmt
- PCC 1: 4: 8 =3.4 bags/cum
- PCC 1:5:10 =2.52 bags/cum
- PCC 1:3:6 =4.2 bags/cum
- PCC 1:2:4 =6.02 bags/cum
- 230 mm brick =0.876 bags/cum
- 115 mm brickwork =0.218 bags/cum
- VDF 100 mm thick =0.82 bags/sqm
- Granolithic flooring =40 mm 0.35 bags/sqm
- Granolithic flooring =20 mm 0.28 bags/sqm
- Anti-skid =0.28 bags/sqm
- Ceramic =0.28 bags/sqm
- Vertified tile flooring =0.28 bags/sqm
- Vertified tile dado =0.27 bags/sqm
- Ceramic dado =0.27 bags/sqm
- Marble flooring =0.3 bags/sqm
- 100 mm ht marble skerting =0.027 bags/rmt
- Marble glading =0.27 bags/sqm
- Terracota tle flooring =0.3 bags/sqm
- Mangalore tile =0.3 bags/sqm
- Door frame fixing =0.17 bags/sqm
- Water proofing for sunken slab =0.23 bags/sqm
- Waterproofing for walls =0.23 bags/sqm
- Water proofing for balcony/toilets =0.65 bags/sqm
- Anti terminate treatment chemical Name is chlorpyrifos 20 %.38. Diluting 5 Lit of Chemical with 95 Lit of water and usage is 7.5 Sqm Per liter {Diluted}.
- To Provide 1” Dia hole And Deep 1 Foot
Also Read: 19 Different Types of Slabs in Construction | What Is a Slab
Labour Productivity Thumb Rule:-
- Brickwork
- 1 Mason 1 Men mazdoor 1.25 sqm
- 1 Women Mazdoor
- Wall Plastering
- 1 mason
- 1 Men mazdoor 10 sqm
- 1 Women Mazdoor
- Ceiling
- 1 mason
- 1 Men mazdoor 8 sqm
- 1 Women Mazdoor
- External Plastering
- 1 mason
- 1 Men mazdoor 8 sqm
- 1 Women Mazdoor
- Blockwork 8”
- 1 mason
- 1 Men mazdoor 10 sqm
- 1 Women Mazdoor
- Blockwork 6”
- 1 mason
- 1 Men mazdoor 8 sqm
- 1 Women Mazdoor
- Blockwork 4”
- 1 mason
- 1 Men mazdoor 8 sqm
- 1 Women Mazdoor
- Carpenter
- 1 Skilled
- 1 Un skilled 4 Sqm
- Bar bender
- 1 Skilled
- 1 UN skilled 200Kg
- Tile work
- 1 Mason
- 1M Mazdoor 10 Sqm
- Paint
- Painter skilled OBD 600 Sft
- Emulsion 800 Sft
- Putty 600 Sft
- Primer 800 Sft
- External Painting
- Ace-Low quality
- Apex-Medium Quality
- Apex ultima –High Quality
The Miscellaneous Thumb Rules in Construction:-
- One Sqm = 10.763Sft
- One Cum = 35.314 Cft
- One Acres = 4046.873
- Sqm = 43560.17
- Sft = 4840.019Yards
- One Cubic meter = 1000 liter
- One Meter = 3.280Feet
- One Mile = 1609.344 meter
- One Acre = 100 cent
- One ground = 2400
- Sft = 5.51 cent
- ½ ground = 2.75 cent
- One Mile = 8 Furlong
- One cement bag = 1.25 Cft
- One Forma box = 1*1*1.25 feet
For Adding 4 Liters of Water in 1 Cu.m Freshly Mixed Concrete
- The slump value will be increased by 25 mm.
- The compressive strength of concrete will be decreased by 1.5 to 2.0 N/mm2
- The shrinkage potential will be increased by 10%.
- 1/4 bag of cement will be wasted.
If the Temperature of Freshly Mixed Concrete Is Increased by 1%, Then
- 4 liters of water per cu.m will give equal slump.
- The air content will be decreased by 1%.
- The compressive strength of concrete will be decreased by 1.0 to 1.5 N/mm2.
If the Air Content of Freshly Mixed Concrete Is
- Increased by 1% then the compressive strength will be decreased by 5 %.
- Decreased by 1%, the yield will be decreased by 0.03 cu.m per 1 cu.m.
- Decreased by 1%, then the slump value will be decreased by about 12.5 mm.
- Decreased by 1%, then the durability of the concrete will be reduced by 10%.
Also Read: Top 10 Construction Companies in UAE
Rule of Thumb Construction Cost Estimating
A rule of thumb method in cost estimating is drawn from design or practical experience and it provides a rough guide to come up with quantities during the initial stages of design like the concept or schematic phases. The rule of thumb is a method for developing quick approximate estimates of costs.
Thumb Rule Formula
The Thumb rule to determine the area of shuttering needed is 2.4 times the plinth area or six times the concrete quantity. Consider, the quantity of concrete is one cubic meter, then the shuttering area needed is 1 x 6 = 6 square meters.
Steel Column Size Rule of Thumb
A column size depends on the floor area it is supporting; this floor area is calculated by subdividing the distance between the column and all adjacent columns. This area is cumulative from floor to floor. A 6×6 column can support 750 sq. ft; a 8×8 column can support 3000 sq.
What Is a Good Thumb Rule?
A rule of thumb is a guideline, idea, or principle that helps you make decisions. “Arrive early” is a good rule of thumb for most appointments. This term originally referred to builders who used their thumb to estimate measurements. The meaning broadened to mean any inexact but helpful rule.
Like this post? Share it with your friends!
Suggested Read –
- Earthen Dam
- Vertified Tiles
- 19 Different Types of Slabs in Construction | What Is a Slab
- 9 Difference Between Panelled Window And Glazed Window
- What Is a Concrete Surface Retarder | Types of Retarders | Advantages & Disadvantages of Retarder in Concrete
- What Is Vacuum Concrete | Application of Vacuum Concrete | Advantages & Disdvantages of Vacuum Concrete | Process of Vacuum Concrete
Originally posted 2023-05-05 18:25:36.
Leave a Reply